New award: Drafting of the Construction Project for the adjustment of the gauge of the structures of the Algeciras-Zaragoza railway motorway

08-Nov-2022
Eptisa in a 25% joint venture with Fulcrum, Sers and Carlos Fernández Casado, has been awarded the ADIF Contract for the Drafting of the Construction Project for the adjustment of the gauge of the structures of the Algeciras-Zaragoza railway highway. Section: Bobadilla Km 123.00 (Line 430)-Km 336.363 (Line 200).

This contract, for €1,848,989.76 (excluding VAT) and a planned term of 14 months, consists of analyzing the gauge of the existing overpasses and walkways on the future Algeciras-Zaragoza Railway Highway, from Bobadilla (kp 123.057) of the line 430 to km 336,363 of line 200. After analyzing these gauges, and in those cases where the gauge determined by the Contract Directorate for the railway highway is not met, the solutions to be adopted will be defined, which may be related to the lowering of the track, with the replacement of the existing overpasses with new ones, or other types of actions related to the modification of the catenary.
XML 地图 | Sitemap 地图